Here are some before pictures of the bathroom prior to beadboard/sink/tiling.
Monday, November 23, 2009
Bathroom in Progress
Had a plumber come and rip out the sink/vanity a few weeks ago. In order for him to come back I have to put up the beaded board wainscot behind where the new (pedistal) sink will be. I also decided to just tile out the bathroom and have the floor tile guy repair the tub tile at the same time. I don't have the equipment and often don't have the physical strength so I'm learning that for some things its just better to hire someone. And that's ok.
Here are some before pictures of the bathroom prior to beadboard/sink/tiling.

Here are some before pictures of the bathroom prior to beadboard/sink/tiling.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment